Guide · Development process
From prototype to series production — the phases of development.
Between the first idea and a series product lie several maturity levels. Knowing them lets you plan budget, time and testing realistically — and avoid expensive surprises shortly before series production.
1. Proof of Concept
Secure the critical technical assumption first: does the principle work at all? This is about feasibility, not elegance — often with evaluation boards and test setups.
2. Functional sample / A-sample
The first in-house circuit and firmware that demonstrate the function. Form factor and manufacturability still take a back seat; the focus is on showing that the specification can be met.
3. B-sample
Near-series hardware: the final EMC-compliant layout, real components, mechanical integration. This is where EMC pre-compliance sensibly begins — finding faults here is many times cheaper than after series release.
4. Design for Manufacturing (DfM)
The design is made suitable for production and testing: assemblability, test points, tolerances, component availability. The goal is reproducible, economical manufacturing.
5. C-sample & series release
Near-series production, final verification and validation (see V-model), accredited EMC/safety testing, CE — then release. Clean testing across all phases is the common thread.